4. Insert the safety key (a) supplied with the
machine into the door switch as shown. The
machine is now
on
, and the water valve open.
The cup turret mechanism will index the first
available full cup stack to the dispense
position and drop the cup stack into the cup
drop mechanism. Fill the remaining empty
cup stack with cups.
While the machine is powering up, the
LCD will display the message as shown
opposite, indicating that the water in the
boiler is being heated.
5. Instant & Freshbrew machines: As
heater tank fills and heats, ensure that no water overflows from overflow
pipe into the waste tray. Check the system for leaks.
6. B2C Machines: The machine will pump approximately 400ml of water
through the system which will be heated to operating temperature. Ensure
that a suitable container is placed under the dispense head. Remove the
container and empty the contents before proceeding.
Important! Should the machine fail to fill correctly or leak, turn off the
stopcock and the power to the machine before investigating the fault.
7. B2C Machines: On the initial setup the
message opposite is displayed on the
LCD screen. It indicates that the CoEx®
brewer has not been setup, only a trained
technician can setup the CoEx® brewer.
If the CoEx® brewer has been setup this
message disappears after ten seconds.
8. To complete the CoEx® setup procedure, enter the Main Menu, select
Product Configuration and select the CoEx Setup option.
9. The first two menu options, Grinder and Auger Calibration, must be
completed before bean to cup and freshbrew drinks can be be selected.