EasyManua.ls Logo

Getac UX10 - Initializing the Battery Pack

Getac UX10
100 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
28
Initializing the Battery Pack
You need to initialize a new battery pack before using it for the first time or
when the actual operating time of a battery pack is much less than expected.
Initializing is the process of fully charging, discharging, and then charging.
It can take several hours.
The G-Manager program provides a tool called “Battery Recalibration” for
the purpose. (See “G-Manager” in Chapter 6.)
Checking the Battery Level
NOTE: Any battery level indication is an estimated result. The actual
operating time can be different from the estimated time, depending on
how you are using the Tablet PC.
The operating time of a fully charged battery pack depends on how you are
using the Tablet PC. When your applications often access peripherals, you
will experience a shorter operating time.
By Operating System
You can check the approximate battery level using the battery meter function
of the operating system. To read the battery level in Windows, click the
battery
icon on the taskbar.
By Gas Gauge
On the exterior side of the battery pack is a gas gauge for displaying the
estimated battery charge.
Push-button

Table of Contents

Other manuals for Getac UX10

Related product manuals