5
Recording the inspection
SW Service Protocol PM OR Lights LUCEA 50 100-A
38 / 44
Lucea 50_100
01740 EN 01
Document name: SW Service Protocol PM OR Lights LUCEA 50 100
4. Other Parts replaced or need replacing
Lubrication of the suspension bushings
Lubrication of the Light head fork axles
Lubrication of the flat screen holder
Check the hold of the Ceiling cover, seal and silicone sleeve
Check the rigidity of the suspension by shaking
Check the verticality of the suspension tube (spirit level)
Check the hold of the suspension covers
Check the suspension fixing screws
(If screws appear loosened, replace them, do not retighten these screws during maintenance, it can lead to
breakage).
Check the bushing fixing screws
(If screws appear loosened, replace them, do not retighten these screws during maintenance, it can lead to
breakage).
Check the position and condition of spring arm snap ring
Check all other fixing screws
(Tighten them if necessary)
Check the hold of the spring arm covers and metal strips (Only double fork version)
Check the vertical stop of the spring arms (Only double fork version)