Recording the inspection
SW Service Protocol PM OR Lights LUCEA 50 100-A
5
Lucea 50_100
01740 EN 01
39 / 44
Document name: SW Service Protocol PM OR Lights LUCEA 50 100
Check the balancing of the spring arms
Check the presence and condition of the safety segment
Check the presence of the spring arm safety sleeve and the presence of the fixing screw
Check the hold of the light head covers
Check the light head rotation stop
Check the light head brake adjustment
Check the condition of the underside
(no scratches, no cracks)
Check the fixing of the light head handle holder
Check the sterilizable handle engages correctly and stays in place
Check the easy handling of the configuration
Check the condition of the power supply cable and the connection to the power box.
(Only mobile version)
The pole must be vertical and stable
(Only mobile version)
Power Supply Output Voltage 1 (28 VDC +/-10 %)
Power Supply Output Voltage 2 (28 VDC +/-10 %)
Check the tightening of the wires on the terminal blocks
Check if the Power supply is connected to the ground
Check the condition of power supply unit (oxidation, infiltration, cover, …)
Check the condition of the batteries
(Inflated, oxidized terminal, …)
Check the tightening, the stability and the brake efficiency of castors
(Only mobile version)