23
PULL-TO-OPEN
©Ghost Controls
®
2021
INSTALLING THE CONTROL BOX FOR YOUR PULL-TO-
OPEN SYSTEM
STEP 7. Determine the mounting location of the control box and install.
NOTE
Mount the control box a minimum of 3 feet above the ground to keep dirt and water from damaging the control board
and within 4 feet of the operator arm in order for the operator cable to reach the control box.
A. Pre-drill (4) holes (7/32˝ drill bit) in backside of control box, and through the fencing where you will be secur-
ing the control box to.
B. Now use the (4) supplied phillips screws to mount the control box to the fence.
C. Make sure the on/off switch on the bottom of control box is in the off position.