44
PUSH-TO-OPEN
©Ghost Controls
®
2021
INSTALLING THE CONTROL BOX FOR YOUR PUSH-TO-
OPEN SYSTEM
STEP 7. Determine the mounting location of the control box and install.
NOTE
Mount the control box a minimum of 3 feet above the ground to keep dirt and water from damaging the control board
and within 4 feet of the operator arm in order for the operator cable to reach the control box.
A. Pre-drill (4) holes (7/32˝ drill bit) in backside of control box, and through the fencing where you will be secur-
ing the control box to. Make sure arm cable is within 4 feet of the operator arm and reaches the control box.
B. Now use the (4) supplied phillips screws to mount the control box to the fence.
C. Make sure the on/off switch on the bottom of control box is in the off position.