straightness of the installation. You will be able to reference this line to
install the smaller center bracket at a later time.
4.
To find the location of the smaller center bracket please refer to the
chart on the following page. NOTE: The location of the center
bracket must fall directly centered behind the center arms
shoulder location. Failure to follow these instructions will void
the warranty of this product.
5.
Now that you have located the bracket locations, using the bracket as
your template, mark the holes for fastening the bracket. NOTE: It is
up to the installer to find adequate structure to fasten the
roofmount brackets to. All caution must be taken to weather seal
all installation perforations. Failure to do these items could result
in damage to the vehicle.
6.
With the roofmount brackets now installed you may now install the
awnings’ mounting brackets. Using the hardware kit (7/16” carriage
bolts) supplied with your awning, bolt the mounting bracket to the
roofmount brackets through the pre-aligned holes.
7.
Before installing the awning locate the motor location of the awning
and pre-drill a 7/16” hole for the awning motor wire. Make sure you
will be able to access the necessary electrical wiring before drilling the
hole.
NOTE: Please consult your RV’s wiring diagram to ensure that no
wiring will be damaged while drilling the hole.
B.
SIDEWALL APPLICATION – NOTE: Please take into consideration all
possible clearances, and obstacles before installing this awning.
Items such as slide rooms, etc. vary from one manufacturer to
another. Please consult Girard Systems if there are any questions
regarding your insatallation.
1.
The mounting brackets and hardware used for this application are
included with your awning.