EasyManuals Logo

Glow-worm 12 hxi G.C.No. 41-019-01 User Manual

Glow-worm 12 hxi G.C.No. 41-019-01
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #9 background imageLoading...
Page #9 background image
0020107233_00 - 06/11 - Glow-worm
INSTALLATION
- 9 -



This boiler is not suitable for outdoor installation.
This boiler may be installed in any room, although particular
attention is drawn to the installation of a boiler in a room
containing a bath or shower where reference must be made to
the relevant requirements.
This boiler is suitable for installation in bathroom zones 2 and
3.
 this is the current I.E.E. WIRING REGULATIONS and
BUILDING REGULATIONS.
 reference should be made to the current edition of
I.S.813 “Domestic Gas Installations” and the current ETCI
rules.

The boiler should be positioned so that at least the minimum
operational and servicing clearances are provided, see
diagram 3.1.
Additional clearances may be benecial around the boiler for
installation and servicing.
For ue installations where external access is not practicable,
consideration should be given for the space required to insert
the ue internally, which may necessitate clearance larger
than those specied in diagram 3.1.

If the boiler is to be installed in a timber frame building it
should be tted in accordance with the Institute of Gas
Engineers document IGE/UP/7/1998. If in doubt seek advice
from local gas undertaking or Glow-worm.

The boiler and ue are suitable for installation onto and
through combustible materials provided that:-
1) Minimum 5mm clearance is maintained around the
circumference of the ue (air intake).
2) The combustible surface and xings are suitable for
supporting the load.
3) The minimum clearances from the boiler case are
maintained.

The boiler is room sealed so a permanent air vent is not
required.

Due to the high efciency and hence low casing temperature
of this boiler, cupboard or compartment ventilation is not
necessary.
Leave existing air vents.
Diagram 3.1
13204

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Glow-worm 12 hxi G.C.No. 41-019-01 and is the answer not in the manual?

Glow-worm 12 hxi G.C.No. 41-019-01 Specifications

General IconGeneral
BrandGlow-worm
Model12 hxi G.C.No. 41-019-01
CategoryBoiler
LanguageEnglish

Related product manuals