6.1 Appliance Pack
Please check the contents of packs as shown in diagram 6.1.
The packs are located in the top polystyrene packing.
Remove the carton sleeve and top pack then lift the boiler and
its polystyrene base support out of the lower pack.
6.2 Site Requirements
The boiler mounting wall should be suitable for the weight of
the appliance and be true and at.
NOTE: Due to the varied site conditions we do not supply
xings and advise that the installer should supply those which
are suitable.
6.3 Wall Template
Take the wall template from the document pack located within
the top polystyrene packing and place in the desired position
on the wall, giving due consideration to the required boiler
clearances, see section 3, and the ue you are tting.
Mark the position of the ue centre, if tting a side ue, extend
the ue centre line into the corner then 149mm along the
adjacent wall, see diagram 6.2.
For extended side ues, the ue hole centre should be
determined by extending the dashed inclined line on the
template to the side wall, then 149mm along the adjacent
wall, see diagram 6.2. This dashed line is drawn at 44mm/
metre (2.5°) rise from the boiler.
To allow for the ue passing through the wall at this angle
a 125mm hole should be drilled irrespective of internal or
external installation.
Remove the wall template whilst drilling the ue hole.
6.4 Flue Hole Cutting
External access ue installation can use a 105mm diameter
core drill.
Internal access only ue installation will need a 125mm
diameter core drill.
NOTE: The ue is designed with an internal fall of 44mm/
metre (2.5°), therefore the hole can be drilled horizontally.
If ue extension pipes are to be used then a core drill size of
125mm is required. This will allow the extension pieces to
slope at 44mm/metre (2.5°) towards the boiler.
6.5 Wall Hanging Bracket Assembly
The Wall Hanging Bracket is supplied in the main boiler
packaging at the rear of the boiler.
Reposition the wall template over the ue hole and mark
the position of the xing holes for the hanging bracket, see
diagram 6.3.
NOTE: Due to the varied site conditions we do not supply
xings and advise that the installer should supply those which
are suitable.
Drill xing holes and insert suitable wall plugs.
Direct Rear Flue only - If external access is not available the
ue to be used should be assembled as described in sections
10.11 to 10.13 and inserted through the hole in the wall before
tting the wall hanging bracket.
Fit the xing jig support plate to the bottom of the wall hanging
bracket, push down to locate.
Mark, drill and plug at xing points and secure the jig support
plate, see diagram 6.3.
Direct Rear Flue only - The ue can now be pulled back
through the hanging bracket and secured as shown in
diagram 6.3.
6 Installation Preparation
13894
Diagram 6.2
14810
Diagram 6.3
JIG SUPPORT
PLATE FIXINGS
HANGING
BRACKET
FIXINGS

Other manuals for Glow-worm Flexicom 24cx

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Glow-worm Flexicom 24cx and is the answer not in the manual?

Glow-worm Flexicom 24cx Specifications

General IconGeneral
Boiler TypeCombi
Fuel TypeNatural Gas
Central Heating Output24 kW
DHW Flow Rate9.8 l/min
ErP Efficiency RatingA
Central Heating Flow Temperature Range30 - 80°C
Weight31 kg
Warranty2 years