10 Vertical Flue - Length, Preparation and Installation
Diagram 10.25
13023
Diagram 10.26
12981
Diagram 10.27
12982
Completion of Installation
With the ue terminal positioned in the roof the length of the
nal pipe can be determined. If a telescopic length cannot
be used, then a standard ue length can be cut to make the
correct length. Cut the ue to the desired length measuring
from the ‘O’ ring end and discard the plain end of the tube.
The cuts must be square and made free of burrs to allow
correct assembly.
NOTE: The ue pipe is 10mm longer than the air pipe, see
diagram 10.28.
Carefully push the terminal assembly upwards to allow room
for tting the nal ue piece. Fit a xing bracket to the terminal
assembly. Pull the terminal assembly down and join to the ue
system. Ensure that the terminal is making a weather tight
seal on the weather collar. Secure the xing bracket tted to
the terminal to the roong struts or a purpose made batton.
Diagram 10.28
12983
14853
Diagram 10.24

Other manuals for Glow-worm Flexicom 24cx

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Glow-worm Flexicom 24cx and is the answer not in the manual?

Glow-worm Flexicom 24cx Specifications

General IconGeneral
Boiler TypeCombi
Fuel TypeNatural Gas
Central Heating Output24 kW
DHW Flow Rate9.8 l/min
ErP Efficiency RatingA
Central Heating Flow Temperature Range30 - 80°C
Weight31 kg
Warranty2 years

Related product manuals