EasyManua.ls Logo

GNB FURY X-3 - Floor Stand Installation

GNB FURY X-3
19 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
Fury X-3 Installaon and Operang Instrucons
Floor Stand Installaon
Floor stands with a pogo are also available
for installaon.
Step 1. Bolt the Stand to the Floor
Secure the stand to the concrete oor through the pre-drilled
holes in the stand base. Use ½ inch diameter anchor bolts as
a minimum.
Step 2. Aach Pogo to the Pogo Bracket
Aach the pogo to the pogo bracket with the bolts provided.
Step 3. Hang the Charger on the Stand
Hang the charger on the oor mount hanger so that the two
slits on the back of the charger line up with the two ns of the
hanger.
Step 4. Mount the Boom Brace to the Charger and Stand
Pre-drilled holes for
bolng base to oor
Pogo

Related product manuals