Firstly the Jib sheet must be set up. The control line part
of this will already be setup from the factory.
To finish setting up the jib sheet the Dyneema must be
part must be passed through the cheek block on the pole
and back through the single pulley on the jib car. Thread
the small single pulley (this will be shackled to the jib clew)
onto the Dyneema and then tie it back trough the center
of the jib car pulley.
Pass the jib traveler line (red) trough the saddle on the
spinnaker pole and then cleat it off in the cleat on the
beam.
The jib downhaul runs from the center of the bridal,
down the starboard bridal and back to the main beam.
To set this up you just need to pass the control line (red),
from where in is tied at the main beam, through the
pulley attached to the Dyneema and back trough the
jam cleat on top of the beam.