Gossen Metrawatt GmbH 3
15.6 Measuring Protective Conductor Resistance – RPE.....46
15.7 Insulation Resistance Measurement – RINS.................50
15.8 Measuring Leakage Current.........................................53
15.8.1 Protective Conductor Current – IPE.............................54
15.8.2 Touch Current – IT.......................................................58
15.8.3 Device Leakage Current – IE........................................61
15.8.4 Leakage Current from the Applied Part – IA .................64
15.8.5 Patient Leakage Current – IP .......................................66
15.9 Probe Voltage – U .......................................................68
15.10 Measuring Voltage – U (only with feature I01, e.g.
SECUTEST ST PRO) ...................................................69
15.11 Measuring Time to Trip for RCDs of the Type PRCD –
tPRCD.........................................................................70
15.12 Function Test – P.........................................................71
15.13 Testing Extension Cords for Correct Function – EL1 ....72
16 Special Functions – EXTRA..............................74
17 Test Sequences (automatic test sequences) ..76
17.1 General Settings
(Setup: Auto Measurements parameter).......................77
17.2 Configuring Test Sequences........................................79
17.2.1 Test Sequence Menu: View and Icons.........................79
17.2.2 Selecting and Configuring the Integrated Test
Sequence at the Test Instrument.................................81
17.2.3 User-Defined Test Sequences
(necessitates SECUTEST DB+ – Z853R or feature
KB01 – and IZYTRONIQ) .............................................89
17.3 Connecting the DUT....................................................89
17.4 Selecting a Test Object................................................89
17.5 Checking Connection and Starting the Test Sequence 90
17.6 Executing and Evaluating Test Steps ...........................90
17.7 End of the Test Sequence ...........................................91
17.8 Saving Test Results .....................................................92
17.9 Remote Control – Automated Test Sequence Control
with IZYTRONIQ Software ...........................................93
18 Reports..............................................................94
18.1 Print Settings...............................................................94
18.2 Saving Reports to a USB Flash Drive HTML)................94
18.3 Sending Reports to the Printer.....................................94
19
Transferring and Saving Test Structures and
Measurement Data (test instrument data base)
..95
19.1
Export – Transferring Test Structures and Measurement
Data from the Test Instrument to the PC (IZYTRONIQ)..... 95
19.1.1 Via USB Cable.............................................................95
19.1.2 Via USB Flash Drive (only with SECUTEST DB+
database extension – Z853R or feature KB01).............95
19.2
Import – Loading Test Structures Created in the Software
(IZYTRONIQ) to the Test Instrument (only with SECUTEST
DB+ database extension
– Z853R or feature KB01).......95
19.3 Backup and Restore via USB Flash Drive ....................96
20 Maintenance .....................................................97
20.1 Technical Safety Inspections........................................97
20.2 Housing Maintenance..................................................97
20.3 Test Instrument Self-Tests...........................................97
20.4 Backup Battery for Real-Time Clock ............................97
20.5 Fuse Replacement....................................................................97
20.6 Calibration ...................................................................97
20.6.1 Required Recalibration Interval.....................................97
20.6.2 Setting Calibration and Recalibration Dates .................98
20.7 Software/Firmware Update (system info parameter).....98
21 Troubleshooting: Warnings, Error Messages
and Notes ..........................................................99
21.1 Types.......................................................................... 99
21.2 List of Error Messages .............................................. 100
22 Contact, Support and Service ........................109
23
Returns and Environmentally Sound Disposal . 109
24 CE Declaration ................................................110