EasyManuals Logo

Graco EcoQuip 2 EQm User Manual

Graco EcoQuip 2 EQm
74 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #32 background imageLoading...
Page #32 background image
Repair
Replacing Replacing
Replacing
the the
the
Pinch Pinch
Pinch
Hose Hose
Hose
Removing Removing
Removing
the the
the
Pinch Pinch
Pinch
Hose Hose
Hose
1.PerformPressureReliefProcedure,page10.
2.Removetheclawcoupler(CP)attheswivel
connection.
3.Usethesupplied2–7/8in.wrenches(WR)to
loosenthelocknuts(S1,S2)ontheinsideand
outsideofthebox.
4.Removetheclamp(HC)connectingtheblast
circuit(BC)tothecheckvalve.
5.Removethebottomhoseclamp(C2).
6.Pullthepinchhose(PH)outofthebox.
NOTE: NOTE:
NOTE:
Usetheblastcircuit(BC)asahandle,
andtwistwhilepulling.
7.Loosentheremaininghoseclampandremove
thepinchhosefromthecircuit.
Installing Installing
Installing
the the
the
Pinch Pinch
Pinch
Hose Hose
Hose
1.Placebothhoseclamps(C1,C2)onthepinch
hose(PH).Leave1/4in.ofhoseexposedonthe
ends.
2.Slidethepinchhose(PH)ontothebarbatthe
blastcircuit(BC).
3.Reinstalltheblastcircuit(BC)andpinchhose
(PH)intotheboxthroughthepinchvalve.
4.Installandtightentheclamp(HC)to15ft-lb(20.3
N•m)toconnecttheblastcircuittothecheck
valve.NOTE: NOTE:
NOTE:
Ifnecessary,loosentheinsidenut
(S2)toprovideroomforgasket(G)installation.
Inspectthegasket(G)andreplaceifnecessary.
5.Applyanti-seizetothreadsonclamps(C1,C2).
Alignthenutspointingtowardsthefrontofthe
enclosure.Torqueto85+/-5in-lb(9.6+/-0.5
N•m).
6.Tightenthelocknuts(S1,S2).
7.Installtheclawcoupler(CP).
32 3A3489E

Other manuals for Graco EcoQuip 2 EQm

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Graco EcoQuip 2 EQm and is the answer not in the manual?

Graco EcoQuip 2 EQm Specifications

General IconGeneral
BrandGraco
ModelEcoQuip 2 EQm
CategoryWater Pump
LanguageEnglish

Related product manuals