EasyManua.ls Logo

Gree GFH09K3FI

Gree GFH09K3FI
164 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
99
U-Match Series DC
Inverter Service Manual
2). Filtering Board:
3
4
5
67
1
2
No. Printing Interface No. Printing Interface
1 N-OUT Neutral wire output (white) 2 L-OUT Live wire output (red)
3 DC-BUS
DC bus interface (connect
to drive board)
4 AC-L Live wire input (red)
5 N Neutral wire input (white) 6 E1 (Reserved)
7 E Grounding wire (screw hole)
2.4 IPM, PFC Testing Method
2.4.1 Method of Testing IPM Module
(1). Preparation before test: prepare a universal meter and turn to its diode option, and then remove the
wires U, V, W of the compressor after it is powered off for one minute.
(2). Testing Steps
Step 1: put the black probe on the place P and the red one on the wiring terminal U, V, W respectively as
VKRZQLQWKHIROORZLQJ¿JXUHWRPHDVXUHWKHYROWDJHEHWZHHQ8393DQG:3
Step 2: put the red probe on the place N and the black one on the wiring terminal U, V, W respectively as
VKRZQLQWKHIROORZLQJ¿JXUHWRPHDVXUHWKHYROWDJHEHWZHHQ1819DQG1:
(3). If the measured voltages between UP, VP, WP, NU, NV, NV are all among 0.3V-0.7V, then it indicates
the IPM module is normal; If any measured valve is 0, it indicates the IPM is damaged.
2.4.2 Method of Testing PFC Module Short Circuit(only for GUHD48NK3FO):
(1). Preparation before test: prepare a universal meter and turn to its diode option, and then remove the
wires L1-2, L2-1 after it is powered off for one minute.
(2). Testing Steps
Step 1: put the black probe on the place P and the red one on the wiring terminal L1-2, L2-1respectively
DVVKRZQLQWKHIROORZLQJ¿JXUHWRPHDVXUHWKHYROWDJHEHWZHHQ/3DQG/3
Step 2: put the red probe on the place N and the black one on the wiring terminal L1-2, L2-1respectively

Table of Contents

Other manuals for Gree GFH09K3FI

Related product manuals