EasyManua.ls Logo

Gree GMV-120WM/B-F

Gree GMV-120WM/B-F
424 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GMV5 D.C INVERTER MULTI VRF SERVICE MANUAL
238
5. Install a new electric
expansion valve.
Weld the connecting pipes with the
electric expansion valve.
Before welding, cover the valve
with wet cloth.
●During welding, charge nitrogen
into the pipes. The pressure should
be controlled within 0.5±0.1 kgf/cm2
(relative pressure).
Note: Avoid nearby parts from being
burnt during welding.
Install the coil on the electric
expansion valve.
6. Fix and wire the
electric box.
●Put the electric box back to original
position and screw it.
Connect all lines.
7. Check and install the
front panels.
●Check various parts and connecting
lines.
If no problem is found, hook the
front panels and tighten the screws.

Table of Contents

Other manuals for Gree GMV-120WM/B-F

Related product manuals