EasyManuals Logo

Gree GMV-120WM/B-F Service Manual

Gree GMV-120WM/B-F
424 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #246 background imageLoading...
Page #246 background image
GMV5 D.C INVERTER MULTI VRF SERVICE MANUAL
243
Heat exchanging board
Precondition: No refrigerant exists in the pipeline system and the power supply has been disconnected.
Step
Diagram
Operation Procedure
1. Loosen the hooks at
the bottom of the
electric box and the
screws.
Remove the upper and lower front
panels.
Loosen the hooks at the bottom of
the electric box.
Use a screwdriver to unscrew the
electric box.
2. Remove the electric
box.
●Disconnect internal and external
connecting lines of the electric box.
●Protect the internal parts during the
disassembly.
3. Disassemble the
heat exchanging board.
●Heat the connecting pipes of the
heat exchanging board by acetylene
welding and then remove the pipes.
Note: Avoid nearby parts from being
burnt during welding. The joints of
the board must be welded with
copper plated steel. Ensure welding
quality.
4. Remove the heat
exchanging board.
●Unscrew the support of the heat
exchanging board, and remove the
support and board.

Table of Contents

Other manuals for Gree GMV-120WM/B-F

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Gree GMV-120WM/B-F and is the answer not in the manual?

Gree GMV-120WM/B-F Specifications

General IconGeneral
BrandGree
ModelGMV-120WM/B-F
CategoryInverter
LanguageEnglish

Related product manuals