EasyManuals Logo

Gree GMV5 Series Service Manual

Gree GMV5 Series
424 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #247 background imageLoading...
Page #247 background image
GMV5 D.C INVERTER MULTI VRF SERVICE MANUAL
244
5. Install a new heat
exchanging board.
●Screw the support of the heat
exchanging board and fix the board
onto the chassis.
●Put the heat exchanging board
based on the position of the suction
and discharge pipes and weld the
pipes with the heat exchanging
board.
●During welding, charge nitrogen
into the pipes. The pressure should
be controlled within 0.5±0.1 kgf/cm2
(relative pressure).
Note: Avoid nearby parts from being
burnt during welding.
6. Fix and wire the
electric box.
●Put the electric box back to original
position and screw it.
Connect all lines.
7. Check and install the
front panels.
●Check various parts and connecting
lines.
If no problem is found, hook the
front panels and tighten the screws.

Table of Contents

Other manuals for Gree GMV5 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Gree GMV5 Series and is the answer not in the manual?

Gree GMV5 Series Specifications

General IconGeneral
BrandGree
ModelGMV5 Series
CategoryInverter
LanguageEnglish

Related product manuals