Notes 
① 
Leakage Switch is necessary for additional installation. If circuit breakers with leakage 
protection are in use, action response time must be less than 0.1 second, leakage circuit must 
be 30mA. 
② 
The above selected power cable diameters are determined based on assumption of distance 
from the distribution cabinet to the unit less than 75m. If cables are laid out in a distance of 75m 
to 150m, diameter of power cable must be increased to a further grade. 
③ 
The power supply must be of rated voltage of the unit and special electrical line for 
air-conditioning. 
④ 
All electrical installation shall be carried out by professional technicians in accordance with the 
local laws and regulations. 
⑤ 
Ensure safe grounding and the grounding wire shall be connected with the special grounding 
equipment of the building and must be installed by professional technicians. 
⑥ 
The specifications of the breaker and power cable listed in the table above are determined 
based on the maximum power (maximum amps) of the unit. 
⑦ 
The specifications of the power cable listed in the table above are applied to the 
conduit-guarded multi-wire copper cable (like, YJV XLPE insulated power cable) used at 40°C 
and resistible to 90°C (see IEC 60364-5-52). If the working condition changes, they should be 
modified according to the related national standard. 
⑧ 
The specifications of the breaker listed in the table above are applied to the breaker with the 
working temperature at 40°C. If the working condition changes, they should be modified 
according to the related national standard. 
1.5.5 Capacity Correction 
  Cooling Capacity Correction 
GRS-CQ4.0Pd/NhG-K, GRS-CQ6.0Pd/NhG-K, GRS-CQ6.0Pd/NhG-K, GRS-CQ10Pd/NhG-K, 
GRS-CQ12Pd/NhG-K,GRS-CQ14Pd/NhG-K, GRS-CQ16Pd/NhG-K, GRS-CQ10Pd/NhG-M, 
GRS-CQ12Pd/NhG-M, GRS-CQ14Pd/NhG-M, GRS-CQ16Pd/NhG-M