77
Installation and Maintenance
Service Manual
11. Removal Procedure
Step Procedure
5.Remove electric box and wire-passing groove sub-
assy
Remove the four screws fixing the electric box cover
and then remove the electric box cover; disconnect the
wiring terminal of each electronic components and then
remove related electronic components according to
your requirements;
1.Remove the two screws fixing the electric box assy
and then lift the electric box assy outwards to remove it;
2.Remove the four screws fixing the cover of wire-
crossing groove and then remove the cover of wire-
crossing groove;
3.Remove the four screws fixing the wirecrossing
groove and then remove the wirecrossing groove sub-
assy.
6. Remove air-outlet panel
Remove the three screws at the top and two screws
at the lower part of air outlet panel and screws in the
screw covers at two sides; push the air outlet panel
upwards slightly to remove the air outlet panel assy.
electric box assy
electric box cover
screws
wire-crossing groove
screws
screws
air-outlet panel