EasyManua.ls Logo

Gree U-MATCH GUHD09NK3CO - Page 161

Gree U-MATCH GUHD09NK3CO
264 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
A/A DC INVERTER U-MATCH AIR CONDITIONERS MAINTENANCE
158
13. Assemble the
fan
Assemble the axial
flow fan to correct
position and fix it to the
motor shaft in reverse to
the disassembly
procedures.
Put the electric box
cover to correct position
and fix it onto the
electric box according to
disassembly
procedures.
14. Connect the
motor power
cable
Connect the insert of
motor power cable to
the mainboard terminal
in reverse to the
disassembly
procedures.
15. Assemble the
electric box cover
Assemble the electric
box cover to correct
position
Use screwdriver to fix
the cover onto electric
box.
Removal and Installation of Electronic Expansion Valve
Note : Before removing the compressor, make sure that there is no refrigerant inside the pipe system and that the
power has been cut off.
Step Illustration Handling Instruction
1. Loosen the electric
expand valve fitting
用手松动电子膨胀阀线圈

Table of Contents

Related product manuals