GREE              Duct type Ducted Type Split Air-Conditioner Units 
71 
6.2 Testing of Drain Piping   
(1)  After piping work is finished, check if drainage flows smoothly. 
(2)  Shown in the figure, Add approximately 1liter of water slowly into the drain pan and check 
drainage flow during COOL running. 
7 Electrical Installation   
(1)  The wiring must be in accordance with the local rules.   
(2)  Rated supply voltage and special circuit for air conditioner must be used.   
(3)  Do not pull the power cord forcefully.   
(4)  All the electric installations must be carried out by specialist technicians in accordance with the 
local laws, rules and these instructions.   
(5)  The diameter of flexible wire should be wide enough. Replace the damaged power cord and 
connecting wire with special flexible wire.   
(6)  The earthing shall be reliable and connected to the special earthing device on the construction. 
The installation must be done by specialist technicians. The leak protection switch and air 
switch with enough capacity must be installed. The air switch shall have both the magnetic 
tripping and thermal tripping functions to ensure protection against the short circuit and 
overload. 
(7)  The air conditioner belongs to I type electric appliances. The reliable earthed action is a must.   
(8)  The yellow and green wire inside the air conditioner is the earthed wire. Do not use it for other 
purpose or even cut off it. Do not fix it with tapping screw,. Otherwise, it may cause electric 
shock.   
(9)  The earthed resistance must meet the requirements of local national standard.   
(10) There should be reliable earthed terminal for the power supply. Never connect the earth lead to 
the following articles: 
①
water pipe; 
②
gas pipe; 
③
drain pipe; 
④
unreliable place considered by professionals.