EasyManua.ls Logo

Gree VIREO GEN3 3VIR09HP115V1A - Page 86

Gree VIREO GEN3 3VIR09HP115V1A
101 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
83
Installation and Maintenance
Service Manual
Step Procedure
9.Remove 4-way valve assy
Unsolder the welding joints connecting the 4-way
valve assy with capillary sub-assy,compressor and
condenser; remove the 4-way valve.
Note:
Before unsoldering the welding joint, wrap the 4-way
valve with a wet cloth completely to avoid damage to
the valve caused by high temperature.
10.Remove liquid valve and gas valve
Unsolder the welding joint connecting the valve with
capillary and condenser; unsolder the welding joint
connecting the gas valve and air-return pipe;
Remove the 2 screws fixing the gas valve to remove
the gas valve.
Unsolder the welding joint connecting the liquid valve
and Y-shaped pipe; remove the 2 screws fixing the
liquid valve to remove the liquid valve.
Note:
Before unsoldering the welding joint, wrap the gas
valve with a wet cloth completely to avoid damage to
the valve caused by high temperature.
11.Remove compressor
Remove the 3 footing screws of the compressor and
remove the compresso;
Remove the screws fixing valve support and then
remove the valve support.
4-way valve assy
Liquid valve
Gas valve
Compressor
11. Removal Procedure

Related product manuals