-A13-
16. Strap Accumulator Motor M4
17. Automatic Feed Motor M5
18. Proximity Sensor SQ1
19. Proximity Sensor SQ2
20. Proximity Sensor SQ3
21. Fan (M11)
22. Heater
23. Photo Eye (Option)
24. Timer Box (Option)
25. Foot Bar (Rear)(Option)
3.4
Installation
1.
Remove the packing material and check that the machine is complete and
without any shipping damage.
2.
Installation of Arch Unit
a. Unpack the Arch Unit from the pallet.
b. Open the Upper Table Front and take out the package of spare parts from the
machine inside. These spare parts are listed as below.
c. Loosen the fixing bolt (about 2-3 turns) of Upper Table Rear and then
remove it (pull it up and then remove it backward).
d. Loosen M7-1-102000 Spring on M7-1-131101 Slide Table Frame and then
move M7-1-131600 Slide Table backward.
e. Install the Arch Unit to the fixing position and then have 9 sets of spare parts
Item D (HBS0616+SW06+PW06A) install in both sides of the Arch Unit,
Strap Guide(R) and Strap Guide (L); hand tied them.