EasyManua.ls Logo

Grundfos ALLDOS KM 251 - Combined Overpressure and Degassing Valve; Diaphragm Protection System AMS; Double Diaphragm System; Diaphragm Breakage Signal (Optional)

Grundfos ALLDOS KM 251
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
KM 251 en
16 15.720148-V1.0
1p Motor
2p Worm gearing
3p Eccentric
5p Sliding plug
6p Piston
M combined overpressure and degassing valve
E Degassing valve
9p Diaphragm protection valve (AMS)
Q Dosing diaphragm
2 Dosing head
3a Suction valve
3b Pressure valve
L Stroke adjustment button
F Aeration screw with oil-level gauge
4.1.1 Combined overpressure and degassing valve
The combined overpressure and degassing valve (M) opens if there is an excessively
high build-up of pressure in the dosing system and provokes the constant degassing of
the hydraulic medium.
4.1.2 Diaphragm protection system AMS
The diaphragm protection system AMS (9p) has a keypad, which is connected to the
dosing diaphragm. The dosing diaphragm oscillates freely in the dosing head and cannot
be overstretched due to a fault in the dosing system, since the diaphragm protection valve
closes if a fault like this occurs.
4.1.3 Double diaphragm system / Diaphragm breakage signal (optional)
General
The piston diaphragm and high-tech dosing pumps with drift-free diaphragm breakage
signal are equipped with:
Dosing head with PTFE double diaphragm system and
ball check valve with built-in contact manometer
Double diaphragm system
Dosing pumps with a double diaphragm system with no diaphragm breakage signal have
no manometer. In this case the ball check valve is fitted with a locking unit, order No. 541-
013. The valve however can be retrofitted with a contact manometer.
Ball check
In order for the diaphragm breakage signal to work and to protect the diaphragms, the
gap must be fully deaerated. Dosing heads with a double diaphragm are equipped with a
ball check valve (T), to prevent air from flowing back during the filling and deaeration pro-
cess (2u).
Functioning of the diaphragm breakage signal
The check valve and intermediate gap of the diaphragms are filled with a separating
agent (paraffin oil) at the factory and are set in such a way during start-up on the test
stand, that there is always a hydraulically separated equilibrium between the valve and
S Contact manometer
T Ball check
U Connection piece
2) For dosing heads with a
double diaphragm with no con-
tact manometer (no diaphragm
breakage signal), a locking unit
(order number 541-013) is fitted
instead of the contact manome-
ter.
T
5u
4u
3u
2)
U
5s
3u
2u
S
6s

Table of Contents

Related product manuals