EasyManua.ls Logo

Grundfos ALLDOS KM 251 - Page 25

Grundfos ALLDOS KM 251
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
KM 251 en Installation
V1.0 25
Caution
Risk of damage to the system! We always recommend using pulsation dampers for
large high-speed pumps!
Since the pulsation is influenced by many factors, a system-specific calculation is
essential, e.g. on request with our calculation program.
To install the suction line:
Keep the suction line as short as pos-
sible, avoid a tangled suction line
If necessary, use swept bends
instead of elbows.
Always lay the suction line rising to
the suction valve of the dosing pump.
Avoid loops which cause air bubbles.
For easy deaeration of the dosing head:
Install a ball valve (11i) with bypass line (back to the dosing tank)
immediately behind the pressure valve.
In case of long pressure lines:
Install a check-back valve (12i) into the dosing line.
For suction-side installation
Depending on the pump type and line length, it
may be necessary to use a suction pulsation
damper (4i).
Observe the “Approximate values when using
pulsation dampers” auf Seite 22 and if necessary
request a system-specific calculation from our
calculation program.
For pressure-side installation
Depending on the pump type and line length, it may be
necessary to use a pulsation damper (4i) on the
pressure side.
For rigid pipework and line length > 2m, for flexible
pipework and line length > 3m, depending on the
pump type and size, use pulsation dampers (8) to pro-
tect the system.
11i
12i
4i
8i

Table of Contents

Related product manuals