2
English (US)
English (US) Installation and operating instructions
Original installation and operating
instructions
These installation and operating instructions
describe Grundfos Unilift KP 150, KP 250 and
KP 350.
Sections 1-5 give the information necessary to
be able to unpack, install and start up the
product in a safe way.
Sections 6-10 give important information about
the product, as well as information on service,
fault finding and disposal of the product.
CONTENTS
Page
1. Limited warranty
3
2. General information
3
2.1 Hazard statements
3
2.2 Notes
4
2.3 Overview drawing
4
3. Receiving the product
4
3.1 Inspecting the product
4
3.2 Scope of delivery
4
4. Installing the product
5
4.1 Pipe connection
5
4.2 Minimum space
6
4.3 Location
6
4.4 Adjustment of cable length for a float
switch
7
4.5 Check valve
7
4.6 Electrical connection
7
5. Starting up the product
8
5.1 Starting
8
6. Product introduction
9
6.1 Product description
9
6.2 Applications
9
6.3 Identification
10
6.4 Functions
11
6.5 Pump construction
11
7. Servicing the product
12
7.1 Cleaning the pump
12
7.2 Contaminated pumps
14
7.3 Replacement of parts
14
8. Fault finding the product
15
9. Technical data
17
9.1 Electrical data
17
9.2 Operating conditions
17
9.3 Storage temperature
17
9.4 Sound pressure level
17
10. Disposing of the product
17
Read this document before installing
the product. Installation and operation
must comply with local regulations
and accepted codes of good practice.
Successful operation depends on
careful attention to the procedures
described in this manual. Keep this
manual for future use.