EasyManua.ls Logo

Hach TU5300 sc - Page 18

Hach TU5300 sc
30 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Tubing
6
Tubing cutter
1. Plumb the instrument. Refer to the illustrated steps that follow and Figure 6.
Note: To plumb the instrument with accessories, refer to the documentation supplied with the accessories.
2. If a service bracket is not installed near the instrument, do the steps that follow:
a. Do not do illustrated steps 1 and 2.
b. Do illustrated steps 3 and 4 with the process head on the instrument.
c. Before step 5, remove the process head from the instrument.
d. Hold the process head so that it is not above the instrument or put the process head on the
optional process head holder.
e. Do illustrated steps 5 and 6.
f. When there are no leaks from the process head or the flow regulator, install the process head
on the instrument (illustrated step 8).
Figure 6 Plumbing overview – no accessories
1 Service bracket 4 Flow regulator
2 Sample inlet 5 Flow shutoff valve
3 Sample outlet
6
Refer to Specifications on page 3 for the tubing requirements.
18 English

Related product manuals