7 | P a g e
2.4 Electrical Power (continued)
Correcting Motor rotation in systems
using 3-Phase power
A licensed electrician should interchange
any two wires of the three-phase power
source at the disconnect switch to correct
improper pump rotation or improper phase
displayed by the phase monitor.
Phase Monitor Factory settings
1) Apply power to chiller.
2) LED on phase monitor will blink
green for 180 seconds.
3) LED will be green and on solid
indicating all is OK.
4) See photo below for error codes.