EasyManua.ls Logo

Haskris OPC3-OPC15 User Manual

Haskris OPC3-OPC15
46 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Effective Date: 02 September 2022
Revision: 00
MANUAL
MODELS OPC3 THROUGH OPC60
Question and Answer IconNeed help?

Do you have a question about the Haskris OPC3-OPC15 and is the answer not in the manual?

Haskris OPC3-OPC15 Specifications

General IconGeneral
BrandHaskris
ModelOPC3-OPC15
CategoryChiller
LanguageEnglish

Summary

Haskris Contact Information

Confirm Chiller Model and Number of Frame Sections

Frame Sections Overview

Details the number of refrigeration circuits and frame sections for each model.

Installation: Foundation, Vibration, Elevation, Clearances, Transportation

Foundation and Mounting Requirements

Requirements for chiller placement, including foundation type and load.

Vibration Isolation Guidelines

Describes the chiller's vibration characteristics and isolation methods.

Elevation Considerations

Guidance on locating chillers at different elevations relative to the application.

Clearance Requirements for Airflow

Specifies necessary airflow clearances for various chiller models.

Transportation and Rigging Procedures

Provides guidance on lifting, rigging, and transporting chiller units.

Installation: Line Sizing, Piping

Line Sizing Recommendations

Guidance on selecting pipe sizes based on flow rate and length.

Piping Installation Guidelines

Covers piping materials, insulation, valves, and flushing procedures.

Installation: Electrical

Electrical Connection and Codes

Details electrical connection compliance, wiring, and service disconnect requirements.

Phase Monitor and Service Energization

Explains phase monitor function and energizing the service power.

Installation: Piping Flush, Purge

Piping Flush Procedure

Steps to clean debris from piping before chiller startup.

Piping Purge Procedure

Method to remove flush fluid and ensure a clean piping system.

Installation: Glycol Mixture, Filling

Glycol Mixture Requirements

Specifies glycol type, water type, and mixture percentage for freezing resistance.

Reservoir Filling Procedures

Instructions for filling standard and sealed type reservoirs.

Piping Filling Procedure

Steps to fill the piping with glycol mixture and remove air.

Installation: Final Checks

Phase Monitor Verification

Verifies the phase monitor status for correct voltage and phase.

Controller Fault Verification

Ensures the controller displays no active alarms.

Optional Modbus or BACnet Communication Capability

Building Management System Integration

Details requirements for connecting the chiller to a BMS.

Haskris Communication Support

Information on available hardware, software, and specific unit capabilities.

Physical Connection and Wiring

Explains RS-485 and Ethernet connection points and wiring.

Communication Settings Configuration

Procedure to align controller settings with BMS requirements.

Baud Rate Support

Specifies supported baud rates for RS-485 communication.

Startup

Phase Monitor Operation

How to interpret phase monitor indicators and resolve faults.

ON/OFF Switch Operation

Instructions for using the rotary ON/OFF switch to control the chiller.

Pump Priming Procedure

Procedure to fill the pump head with fluid for proper operation.

Pump Supply Pressure Adjustment

How to ensure adequate pump pressure by adjusting flow restriction.

Controller Display

Main Display Overview

Explains the components and data shown on the main display.

Status Modes Interpretation

Describes the meaning of different status indicators on the controller.

Adjusting Set Value (sv)

Procedure to change the desired supply fluid temperature setting.

Units of Measure Configuration

How to select and configure the display units for measurement.

Faults

Identifying and Displaying Faults

How to detect, view, and understand fault descriptions and history.

Common Faults and Resolutions

Lists common faults, their explanations, and steps to resolve them.

Chiller Features

Corrosion Resistant Condensers

Details the benefits of e-coated condensers for corrosion protection.

Dynamic Capacity Control

Explains chiller operation across a range of heat loads, including no-load.

Local Monitoring Capabilities

Information on available potential free fault contacts on the controller.

Remote ON/OFF Control

Instructions for connecting and configuring remote ON/OFF functionality.

Optional Remote Control Panel

Details the remote panel's function, installation, and connectivity.

Optional Redundant Pumps

Describes the purpose and operation of redundant primary/standby pumps.

Optional Hail Guard Panels

Explains the function of panels protecting condensers from hail damage.

Maintenance

Inspection Frequency and Schedule

Schedule for routine inspections and preventative maintenance.

Glycol Mixture Maintenance

How to check and maintain the glycol mixture level and quality.

Wye Strainer Cleaning

Procedure for cleaning the wye strainer to maintain fluid flow.

Condenser Coil Cleaning

Maintenance steps to remove dust and debris from condenser coils.

Electrical Inspection Procedures

Guidance on performing electrical checks using a multimeter and phase monitor.

Related product manuals