VIII. Installation: Final Checks
Phase Monitor
Check: If the voltage and phase from the service disconnect is correct, the phase monitor should
have a solid green LED. If the phase monitor has a solid or flashing red LED, contact a licensed
electrician to correct the fault.
Controller Faults
Check: Press the button on the controller. The screen should say NO ALARMS. If any faults are
described, consult Haskris to resolve these.