- 7 -
3.Holding
Afterthetemperatureandpressurereachedthesetvalue,holdingphase
beginsandmaintainsstabletemperatureandpressureforaperiodoftime
toensurethatthesterilizationeffectmeetstherequirementsofthe
specification
4.Depressurizatio
n
Thepressureinthechamberisreleasedaftertheholdingtimeisover.Atthe
sametime,thesteaminthesteamgeneratorisdischarged.
5.Drying
Aftersterilization,thesterilizeditemsaredried.Dryingbeginsafterpressure
isreleased.Undertheeffectofahighefficiencyairfilter,theairinthe
chamberisalwayssterileduringthedryingprocess
6.Intake
Thedryingprocessisalsotheprocessofintake,makesurethatthepressure
inthechamberreturnstoenvironmentalpressureattheendofthe
program.
1.7.2 Vacuumtest
Thepurposeofthevacuumtestistotesttheleakrateofthesterilizer.Nosterilizationoftheitemsinthe
chamberduringtheprocess.Pleaserunthevacuumtestinacoldanddrychamberwithoutloads.
Processname Description
1.Vacuum
Theairinthechamberisevacuatedtillthepressureinthechamberreaches
thesetvalueofthevacuumtest
2.Balancingtime
Afterwaitingfor5minutes,thevacuumeverywhereinthechambertendsto
beuniform.
3.Testholding
time
Testholdingtimeis10minutes,Thedevicecontinuouslymonitorsthe
pressureinthechamberduringtheperiod
4.Endoftest
Afterthetestisover,thescreendisplaysthetestresults:vacuumandleak
rate.
2 Installationandhandlinginstructions
2.1 Unpackingprecautions
Installation,setup,andcommissioningshouldbeperformedbya
professionalauthorizedbythemanufacturerofthisproduct.
Thisproductistakenoutoftheboxandtransportedmustbe
operatedby2people.
Totalweight:Q50B59.6kg;Q51B61.6kg;
Q70B64.8kg;Q71B66.8kg