EasyManua.ls Logo

Heathkit SB-1000 - Page 29

Heathkit SB-1000
75 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Heathkit
ie
C7:
Connect
a
1000
pF
(102)
mica
capacitor
from
coil
L2
lug
2
(NS)
to
the
bottom
hole
in
solder
lug
FD
(S-2).
NOTE:
You
will
connect
wires
to
the
top
hole
in
this
solder
lug
later.
(Y
CS:
Connect
a
3300
pF
(332)
mica
capacitor
from
coil
L1
lug
2
(NS)
to
the
top
hole
in
solder
lug
FD
(NS).
C6:
Connect
a
2700
pF
(272)
mica
capacitor
from
coil
L1
lug
1
(NS)
to
the
top
hole
in
solder
lug
FD
(S-2).
NOTE:
Two
wires
were
previously
soldered
to
the
bottom
hole
in
this
solder
lug.
Refer
to
Pictorial
5-4
while
you
perform
the
following
steps.
NOTE:
When
a
step
directs
you
to
prepare
a
solid
wire,
first
cut
the
wire
to
the
indicated
length.
Then
remove
1/4"
of
insulation
from
each
end.
Prepare
the
following
lengths
of
small
black
solid
wire.
The
wires
are
listed
in
the
order
in
which
you
will
use
them.
See
S212"
aE
2-1/2"
431/4"
3/4"
Bue
1/4"
9-1/4"
oy
Route
one
end
of
a
3"
black
solid
wire
through
grommet
FA
and
connect
it
to
coil
L6
lug
1
(NS).
The
other
end
of
this
wire
will
be
connected
later.
Connect
a
2-1/2"
black
solid
wire
from
coil
L6
lug
1
(S-3)
to
switch
SW2A/SW2B
lug
14
(S-1).
YY
Connect
a
2-1/2"
black
solid
wire
from
coil
L6
:
lug
2
(S-2)
to
switch
SW2A/SW2B
lug
7
(S-1).
Nea
Connect
one
end
of
a
2-1/2"
black
solid
wire
to
coil
L5
lug
1
(S-
2).
The
other
end
of
this
wire
will
be
connected
later.
Mae
Connect
a
3-1/4"
black
solid
wire
from
coil
L4
lug
2
(S-2)
to
switch
SW2A/SW2B
lug
12
(S-1).
o
K%
4
4
anchesy
2
3
Page
31
Connect
a
3-3/4"
black
solid
wire
from
coil
L1
lug
2(S-2)
to
switch
SW2A/SW2B
lug
1
(S-1).
Ww
Connect
a
3-1/2"
black
solid
wire
from
coil
L1
lug
1
(S-2)
to
switch
SW2A/SW2B
lug
8
(S-1).
Connect
a
3-1/4"
black
solid
wire
from
coil
L2
lug
2
(S-2)
to
switch
SW2A/SW2B
lug
3
(S-1).
wf
Ir
x
Connect
a
2-1/4"
black
solid
wire
from
coil
L2
lug
1{(S-2)
to
switch
SW2A/SW2B
lug
10
(S-1).
Connect
a
3"
black
solid
wire
from
coil
L3
lug
2
(S-2)
to
switch
SW2A/SW2B
lug
4
(S-1),
Connect
the
free
end
of
the
wire
coming
from
coil
L5
lug
1
to
switch
SW2A/SW2B
lug
13
(S-
dD.
Position
all
wires
away
from
the
rotary
switch
shaft
and
the
rotor
so
they
do
not
rub
when
you
turn
the
shaft.
Also
make
sure
switch
lugs
1,
7,
8,
and
14
do
not
touch
the
switch
mounting
hardware.
Refer
to
Pictorial
5-5
while
you
perform
the
following
steps:
()
Reposition
the
input
chassis
as
shown
in
the
Pictorial.
NOTE:
The
inset
drawing
on
the
Pictorial
shows
you
how
the
rotary
switch
lugs
are
numbered.
Each
position
is
numbered,
even
if
there
is
no
lug
at
that
position.
YW
v
Cut
a
1-3/4"
length
of
large
bare
wire.
Then
use
pliers
to
flatten
at
least
half
of
its
length
so
it
will
fit
into
the
holes
in
the
rotary
switch
lugs.
VW
Pass
the
flattened
end
of
the
1-3/4"
large
bare
wire
through
switch
SW1D
lug
1
to
switch
SWIE
lug
1
(both
lugs).
Leave
about
1”
of
bare
wire
extending
from
SWD
lug
1.
Then
solder
the
wire
to
all
three
lugs.
L9:
Refer
to
Detail
5-5A
and
use
the
following
procedure
to
mount
the
toroid
coil
to
the
input
chassis:
Y
1.
Use
a
knife
or
screwdriver
blade
to
clean
away
any
excess
tar
from
the
mounting
hole
of
the
toroid
coil.
4
5 6
A
A
ye,
wey
se)
TB
Oo
8
1
cm
2
3
«
a
. >
a
°
10
2
13
“4
ry

Other manuals for Heathkit SB-1000

Related product manuals