EasyManua.ls Logo

Hellenbrand PM6 IC Storm 10 - Pre-Installation Check List; Water Pressure, Quality, and Plumbing; Drain Line and Bypass Valve Requirements; Bypass Valve Operation Modes

Hellenbrand PM6 IC Storm 10
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4
Water Pressure: A minimum of 25 pounds of water pressure
(psi) is required for regeneration. Maximum pressure 100 psi.
Water Quality: On rural water supplies there is often a problem
with sand or sediment in the water. (This problem occasionally
occurs in public water supplies.) Sand and sediment may plug
the lter, restricting the ow through the media bed. Note: Well
and/or pump problems affecting the operation of the lter and
repairs are not covered under the warranty.
Electrical: A continuous 110 volt/60 cycle current supply is
required. Make certain the current supply is uninterrupted and
cannot be turned off with another switch. All electrical connec-
tions must be connected per local codes. Surge protection is
recommended with all electrical controls.
Existing Plumbing: Condition of existing plumbing must be
free from lime and iron build-up. Piping that is built-up heavily
with lime and/or iron must be replaced. If piping is blocked with
iron, additional equipment may be needed ahead of the lter to
correct the problem.
Drain Line: The lter should be located close to a drain. Avoid
overhead drain lines if possible to prevent back pressure. Over-
head drains are not to exceed 8 feet above the oor and no more
than 20 feet in length. The pipe size for the drain line should be
a minimum of 3/4”. Backwash ow rates in excess of 10 gpm
or length in excess of 20’ require 1” drain line.
Bypass Valves: Always provide for the installation of a bypass
valve.
Caution: Water temperature is not to exceed 110°F; the lter
cannot be subject to freezing conditions, or to a vacuum due to
loss of pressure (such as a water main break).
PRE-INSTALLATION CHECK LIST
Figure 4
Figure 3
(All electrical & plumbing should be done in accordance to all local codes)
Storm is limited to indoor installations
BYPASS VALVE OPERATION
Figure 1
Figure 2
Softening - Filtering

Related product manuals