User manual for poly-phase meter
43
3、Open the meter terminal cover and adjust the height of hanger.
4、Using the vertical installation method, the meter is hanging on the hanger screw,
and fixed on the bottom by two screws. Need to ensure that the 3 screws are
completely banned, and the meter is installed firmly, without shaking.
To ensure the installation stability, the diameter of hanger screw must
be greater than 11mm, and the diameter of bottom fixed screws must
be greater than 7mm.
5、Cut the cable to the required length and use the wire stripper to uncover the cable.
The recommended bare metal length after stripping is at least 20mm for this series
of products.
We insist on the recommended length of the stripped wire to ensure that
the bare metal part is long enough and can be fixed by two connection
screws at the same time. However the bare part should not exceed the
terminal box wiring holes, ensure the safety and insulation effect.
6、When using a small sectional cable, such as 4mm squared, the cable must be placed
in the medium to ensure that the screw is well tightened without deviation.