EasyManua.ls Logo

HighPoint SSD7105 - Page 10

HighPoint SSD7105
19 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Using HighPoint NVMe RAID AICs with the Dell Precision 3930 Rack Workstation
10
i. Press the riser1 module latch to secure the HighPoint NVMe RAID AIC
bracket.
j. Install the riser1 module into the system connector.
k. Align the system cover with the system board and then push down on the
system cover latch.
l. Insert a screwdriver and turn clockwise to lock the system cover latch.

Other manuals for HighPoint SSD7105

Related product manuals