EasyManua.ls Logo

Hitachi CP-WX11000 - Wiring Diagrams

Hitachi CP-WX11000
121 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
49
CP-WX11000 ( P6WX )
7. Wiring diagrams
Wiring diagram 1
(1) Attach #218A.
(2) Connect CNLAP, CNPFC and CNBAR to power unit (ballast).
(3) Connect CNTS and CNPW to power unit (circuit).
(4) Wiring of CNBAR, CNTS, CNPW, CNPFC and CNLAP.
Lock CNLAP completely.
Area of Importance
CNPW
Lock CNPFC completely.
Clamp CNPFC by M-clamp. Shift UL tube near ballast side so that
M-clamp cannot pinch it.
Place excessive length of cables near power unit (ballast) to prevent
UL tube from interfering M clamp.
Assemble with care on since heatsink has sharp edges.
CNPFC
CNBAR
CNTS
CNPW
Pass CNBAR, CNTS and CNPW
through hole of metallic box.
CNLAP
Pass CNLAP through hole of
metallic box and insulation
sheet slit.
CNPFC
Lock CNPFC completely.
Area of Importance
Connect its end without #218A to
power unit (ballast)
Make sure to confirm the print of
CNTS.
Area of Importance
Confirm that the print indicates
”UP62 UCHIYA 90C”.
Connect CONPW (cable tie
side) to power unit (circuit).
Area of Importance
#218A
CNPFC
15mm
20mm
Attach #218A in the position shown in the picture with
its sponge side facing connector housing, and cover
housing in order to protect housing from electrolyte
that comes out of electrolytic capacitor when its vent
opens.
CNTS
CNLAP
W
W
i
i
r
r
i
i
n
n
g
g
o
o
f
f
t
t
h
h
e
e
p
P
o
o
w
w
e
e
r
r
Unit
CNBAR
The operations with this symbol have implications with laws/standards.
It is possible to be in violation of these laws/standards in the case
that these operations are not carried out according to the instructions.
Assemble according to the operation instructions.
Area of Importance
Area of Importance
Area of Importance

Other manuals for Hitachi CP-WX11000

Related product manuals