EasyManua.ls Logo

Hitachi DKC910I - Page 79

Hitachi DKC910I
138 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Copyright © 2019, 2021, Hitachi, Ltd.
DKC910IHitachi Proprietary
[INST(RM)08-01-50]
Rev.1.1
INST(RM)08-01-50
(g) <SVP Switching>
Wait for about three minutes until the switching is completed. The Additional SVP and the
Maintenance PC are disconnected due to the SVP switching process.
(h) Verifying the LED
Make sure that statuses of the LEDs on the SSVP0 and SSVP1 are those as shown in the figure
below.
Figure 8-2 LED Statuses on SSVP
SVP STATUS LED
Front View of SSVP
LED Status SSVP0 (SVP-BASIC)
LED Status SSVP1 (SVP-OPTION)
lighting
lighting

Other manuals for Hitachi DKC910I

Related product manuals