EasyManua.ls Logo

Hitachi RAS-25SX8 - Electrical Installation; Fan Motor

Hitachi RAS-25SX8
254 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
– 156 –
(1) Slide and remove the cover of the stepping motor for
lateral vane.
(2) Remove the lugs fixed to the cabinet.
(3) Place your hands on both sides of the dew pan and turn
it upwards, thereby removing it.
(1) Remove the screws that fix the side cover and lower the
cover, thereby removing it.
(2) Remove the screws from both lateral sides and middle of
the top cover.
(3) Remove the screws from the bottom of the front cover
and from the right side.
(4) Pull the right side a little towards you. Then lift the left
side, removing it.
(5) Remove the connectors from each lead wire and remove
the reactor receptacle.
(6) Remove the screws (x 2) fixing the electrical installation
box and detach the screws fixing the grounding wire
(fixed to the right side plate) to remove the electrical
installation box.
7. Dew pan components
(1) Remove the screws that fix the bearing cover to the left
of the evaporator.
(2) Lift the left side of the evaporator, pull it towards you,
and detach the lug of the bottom of the bearing cover.
(3) Remove the screws that fix the fan motor retainer.
(4) Push the bottom of the evaporator upwards and remove
the lugs of the fan motor retainer.
(5) Loosen the fan-fixing screws and remove the fan.
(6) Remove the rubber dampers from the left and right sides
of the fan motor.
(7) Turn the fan motor towards you, thereby removing it.
8. Fan motor
1. Electrical installation
MODEL RAC-25SX8, RAC-35SX8
CN30FORSELF-CHECK 
LD301
LD302
LD303
CONTROLP. W . B .
TESTSWITCH
OUTDOORFAN 
MOTORCONNECTOR
IPM
DCVOLTAGE 
MESUREMENT
POINT(+)
DCVOLTAGE 
MESUREMENT 
POINT(-)

Table of Contents

Other manuals for Hitachi RAS-25SX8

Related product manuals