EasyManuals Logo

Hitachi ZAXIS 17U-2 User Manual

Hitachi ZAXIS 17U-2
183 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #105 background imageLoading...
Page #105 background image
MAINTENANCE
7-2
PREPARE MACHINE FOR
INSPECTION/MAINTENANCE
Before performing inspection/maintenance of the machine,
park the machine as described below unless otherwise
specified.
1. Park the machine on a solid level surface.
2. Lower the working tools such as the bucket and/or
blade to the ground.
3. Run the engine at slow idle speed without load for
approx. 5 minutes to cool down the engine.
4. Turn the key switch OFF. Remove the key from the
switch. If inspection/maintenance must be performed
with the engine running, be sure to place a lookout to
prevent the machine from being operated mistakenly
by other personnel.
5. Be sure to place pilot control shut-off lever (1) in the
LOCK position.
6. Attach an “UNDER INSPECTION/MAINTENANCE”
tag to an easy-to-see place such as the cab door or
one of the control levers.
M1M7-05-024
M1MS-03-001
1

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Hitachi ZAXIS 17U-2 and is the answer not in the manual?

Hitachi ZAXIS 17U-2 Specifications

General IconGeneral
BrandHitachi
ModelZAXIS 17U-2
CategoryExcavators
LanguageEnglish

Related product manuals