EasyManuals Logo

Hitachi ZAXIS 17U-2 User Manual

Hitachi ZAXIS 17U-2
183 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #152 background imageLoading...
Page #152 background image
MAINTENANCE
7-49
3. Clean shank (6) surface.
4. Install rubber pin lock (4) into shank (6) hole as shown.
M104-07-060
5. Position new tooth (1) over shank (6).
M104-07-061
6. Drive locking pin (5) fully into the hole as shown.
M104-07-062
1
5
6
1
6
4
RIGH
T
WRONG
WRONG
WRONG
WRONG
WRONG
RIGH
T
RIGH
T

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Hitachi ZAXIS 17U-2 and is the answer not in the manual?

Hitachi ZAXIS 17U-2 Specifications

General IconGeneral
BrandHitachi
ModelZAXIS 17U-2
CategoryExcavators
LanguageEnglish

Related product manuals