After loader operation the operator must:
• push the stop button on the remote control box and on the loader.
• put the remote control box in a place inaccessible to others
• report any errors, damage or defects on the equipment to the person
responsible for the loader
5. Starting Up of the Loader
Before starting up, the essential safety regulations have to be respected, just as
the general procedure in connection with starting up of the loader has to be
followed.
Please see the Instruction Manual of the loader as well as the RCL Instruction
Manual.
Before loader operation, extend the stabilizer beams and lower the stabilizer
legs to the surface.
5.1 Starting Up from the Indicator Panel of the RCL
When the loader is equipped with an IRC-system, the diodes on the RCL
indicator panel have different indications than a manually operated loader
during start up.
• Connect the pump (PTO); the controller is thus powered
• All stop buttons must be pulled out (there is a stop button at each control
position).
• Push the green press button on the RCL indicator panel.
• The RUN and FUNC diodes are flashing
• Push the yellow press button twice to choose the stabilizer function
• When the stabilizer legs have been lowered, start up the IRC-system
Loader operation can start.
Please note: During stabilizer operation, a change of the load moment of the
loader exceeding 10% will entail that the system automatically changes into
loader operation mode.