E-MON CLASS 3400 METER
39 62-0398—02
Fig. 23. Push Buttons.
10.2 How to Program the Display Screens
The display information can be programed using four push buttons switches. The
push buttons (DOWN, UP, SELECT, MENU) are located at the top of the display
board on the inside front door of the meter. The buttons are used to program the
following:
Load Control (This field sets the load control parameters).
Date & Time (This field sets the month, day, year, and time).
Device ID (This field changes the default setting, which is 1A for EZ7 and 2 for
ModBus).
IP Settings (This field allows you to select the DHCP or static IP address, mask
and gateway information).
Reset KW/KWH Read (This field resets the Peak kW Demand to zero).