EasyManua.ls Logo

Honeywell BCU 370 - Page 22

Honeywell BCU 370
82 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BCU 370 · Edition 01.19 22
Function
After controlled shut-down, the
post-purge time t
PN
starts to elapse
and then the butterfly valve moves
to the Ignition position in prepara-
tion for the next start.
NOTE: Quick start is not allowed for
units with FM or CSA approval.
H0
05
06
07
08
00
00
H0
02
01
H8
08
P9
A1
A2
04
03
Start-up with ϑ signal
Waiting time t
W
Fan run up time t
GV
(P20)
Switch-on delay time t
E
running (P22)
Start-up position/standby
Start-up position/standby
Controlled shut-down
via ϑ signal
Flame proving period t
FS1
running for burner/pilot burner (P13)
Flame proving period t
FS2
running for main burner (P15)
Safety time t
SA2
running for main burner (P14),
V3 opens
Controller enabler signal delay time t
RF
(P29)
Controller enable signal
Post-purge time t
PN
running (P19)
If parameter P27 = 0:
V2 is switched off
Butterfly valve moves to Open position
Butterfly valve moves to Ignition position
Safety time t
SA1
running for
burner/pilot burner (P12),
V1 and V2 open
Pre-ignition time t
VZ
running (P21)
Ignition activated

Table of Contents

Related product manuals