Do you have a question about the Honeywell ControlEdge 2020 SC-UCNN11 and is the answer not in the manual?
Model | SC-UCNN11 |
---|---|
Category | Controller |
Series | ControlEdge 2020 |
Communication | Ethernet, Serial |
Operating Temperature | -20°C to 60°C |
Power Supply | 24 VDC |
Operating System | Linux |
Communication Ports | 2x Ethernet |
Humidity Range | 5% to 95% non-condensing |
Certifications | CE, UL, ATEX |
Product Type | Programmable Logic Controller |
Processor | ARM Cortex |
Details the ControlEdge 900 family hardware, including racks, CPMs, and EPMs.
Provides step-by-step instructions for mounting racks, controllers, and I/O modules.
Explains terminal block wiring, routing, securing wires, and wire shield grounding practices.
Discusses star and ring topologies for I/O communication and network considerations.
Introduces the ControlEdge 2020 controller as a modular, scalable system.
Details components of the ControlEdge 2020 RTU system, including redundant controllers and expansion I/O.
Details system and resolution requirements for installing ControlEdge Builder software.
Provides steps to create a new project using templates within ControlEdge Builder.
Covers setting controller names and configuring IP addresses for controllers.
Details the procedures for disabling and enabling controller redundancy features.
Guides on configuring onboard, expansion, and third-party I/O modules for data acquisition.
Instructions for adding and configuring serial communication modules for data transfer.
Introduces general programming information and steps for using the IEC 61131-3 standard.
Steps to connect to a physical controller or controller simulator via ControlEdge Builder.
Procedures for downloading a compiled project from ControlEdge Builder to the controller.
General prerequisites and procedures for upgrading firmware on controller hardware components.