32 ECS Series Manual — P/N 151455:H 2/15/2022
ECS Device Installation Installing the ECS-INT50W
When mounting the ECS-INT50W in the ECS cabinet that contains an ECS-NVCM, it is necessary to mount the ECS-INT50W on the right
side of the control board. To do this, you will need the ECS-AMPMT mounting kit (ordered separately).
1. Mount the ECS-AMPMT plate into the cabinet using the six supplied screws. Orient with “Top” side up.
2. Secure the ECS-INT50W onto the six PEM studs on the mounting plate with six supplied screws. Ensure the side with only one
terminal block is at the top of the ECS-AMPMT. See the figure below.
4.5.2 Wiring to an FACP
See Figure 4.34 to properly wire the SBUS and power of the ECS-INT50W to the FACP.
TOP
“TOP”
mounting
holes
Figure 4.32 ECS-AMPMT installed in Cabinet
TOP
+-
POWER
+-
I1 N
+-
OUT1
B A
+ -
PEM mounting studs
Figure 4.33 ECS-INT50W Installed Using the ECS-AMPMT
PEM mounting studs
Side with one terminal
block is at the top!