Operation Procedure
Document No. : Hawking LCM Disassembly SOP  Station:
Work Name :                    Ver. :     Date :
Fixture List(Fixture Specification) QTY Fixture List(Fixture Specification) QTY
Step:
Attention︰if an exception occurs, please contact foreman or assistant immediately.
Department:Auditor:
Huang.Ya-jun
IE
1.Disassemble right side attenna by the way 
marked in the pictures.
Disassemble right side attenna
10(1/1)
Important
2019/12/15
PIC 1
PIC 2
Wlan-tidy Bar  1
0.30