Standard Operation Process
Document No. : Hawking FA disassembly SOP Station:
Process Name : Ver. : Date :
Fixture list(fixture specifications) Qty Fixture list(fixture specifications) Qty
Step:
Department:Tabulator:
Ya Zhu
IE
10(1/2)
Disassmble Edp cable/FFC
1.00
圖一
圖二
1.Disassemble Edp cable , pull the belt
of cable from CNTR
2.Disassemble TH pad board FFC
❖ Open the connector cover,take
out Cable/FFC
2018/03/12