Standard Operation Process
Document No. : Hawking FA disassembly SOP  Station:
Process Name :                  Ver. :     Date :
Fixture list(fixture specifications) Qty Fixture list(fixture specifications) Qty
Step:
Department:Tabulator:
Ya Zhu
IE
3(1/1)
Dismantle C top and Base Bottom
1.00
1. Open the machine for about 
60degrees and place it on the table 
vertically.
2.  Dismantle the C top and bottom, use 
suction cup to suck at the bottom 
right position.
3.  Hold top with left hand ,pull suction 
cup with right hand, and remove 
bottom
4.  Lay the notebook flat, and remove 
the whole bottom from left fo right
Take care to protect the appearance 
when disassembling the machine
2018/03/12
Sucker 1