Standard Operation Process
Document No. : Hawking FA disassembly SOP  Station:
Process Name :                  Ver. :     Date :
Fixture list(fixture specifications) Qty Fixture list(fixture specifications) Qty
Step:
Department:Tabulator:
Ya Zhu
IE
8(1/1)
1. Pull out WWAN antenna. (Pic 1)
❖ The number of antenna number 5 to 5, 6
to 6
2. Disassemble WWAN screw和Hinge screw
(6042B0424101)*2,recycle WWAN
(Pic 3);
❖ Screwdriver bit#1
❖ Torque:2.0± 0.3 Kgf.cm
Disassembly WWAN
Pic 1
2019/11/2
0.20
Pic 2
Pic 3